440 concrete paving

Image 1 of 4

440 concrete paving

Dement successfully teamed with Gresham Smith and Partners (GSP) on this design-build (D-B) project to reconstruct the I-40 interchange at SR 222. GSP provided the design services for the roadway, bridge, retaining wall concepts and traffic signals along with right-of-way and environmental management services. The project included the phased replacement of the existing, 2-lane SR 222 bridge over I-40 with a new, 5-lane bridge; 3 retaining walls; reconstruction of the 4 concrete interchange ramps; 2 new traffic signals and approximately 1.2 miles of roadway reconstruction.

Dement and GSP developed the bridge design to utilize retaining walls along I-40 in an effort to shorten the bridge length at the interchange. By implementing this design, the team was able to reduce the overall cost of the project and provide a better value to the Owner. 

I-40 Design/Build

Owner: Tennessee Department of Transportation

Location: Fayette Co., TN

Designer/CEI: Gresham, Smith and Partners